Electrical supply of bakery “Simid”- Sofia

Electrical supply of bakery “Simid”- Sofia

Construction of electricity supply of the ski area in Bansko, including:   design, performance, supply and assembly of two transformer stations for this project, each of which has 3 power transformers 2500 kVA, 20 / 0,4 kV / total 15 MW /; six Main Electric Switchboards /4000A/ with ACO /Automatic changeover/ between them and Electric Switchboards ACO.

Share:

The largest bakery in the Balkan Peninsula "Simid" in Sofia - Bulgaria, chose Electrogetz to equip the entire power plant of the bakery.
We built two transformer stations for this project, each of which has 3 power transformers 2500 kVA, 20 / 0,4 kV / total 15 MW /.
We produced, delivered and installed six Main Electric Switchboards /4000A/ with ACO /Automatic changeover/ between them and Electric Switchboards ACO.
We performed an installation of Medium voltage Switchgear 20 kV too.

We perform year-round and maintenance of these facilities in the factory "Simid."